08527 644675 Request a Call Back

INDRAPRASTH (PHASE 4)

Posted: 1 month ago
9

Overview

Accommodation
Group Housing
Khasra Number
76, 209/2, 215/1, 215/2, 237/1, 216/1 and 4
RERA Number
RAJ/P/2018/858
Application Number
RAJ-RERA-APP-P-2018-1042

About INDRAPRASTH (PHASE 4)

1. M/s Amar Adeshwar Infrastructure is proposing to develop an affordable housing project (EWS/LIG) namely "Indraprasth" under the Mukhya Mantri Jan Awaas Yojna 2015. This is a new project and is proposed to be developed in Jodhpur. As per the guidelines of CMJAY 2015 IN UDH notification dated 3rd April 2017, the timeline of completion of (EWS/LIG) component of projects proposed under the provisions Clause 4A in General Conditions are within time limits stipulated in the above said notification OR as per CMJAY 2015,the Note in provisions of Clause 4A time taken by any Government Agency in issuing required certificate/approval will be deducted from the total construction period. Promoter reserves the right to develop more flats based on the incentive BAR available and extension/sanction and approvals for higher floor for more number of units whichever is applicable and as per CMJAY guidelines/rules in this regard on this land. This project is approved by empanelled architect Mr. Sunil Mahur under provisions of 3A of CMJAY 2015 as per UDH circular dated 31 May 2017. Applicable fee submitted in Jodhpur Development Authority. The total Project land area is 42286.59 and total Phase-4 area of Land is 4992.15 Sqr Mtrs. Presently we have approval of G+11 Floor (Ground Floor + 2 Podium + 9 Residential Floor)and Approx Height is 37.75 Mtr.).All the drawings has been uploaded (all set of approved drawings)in following manner,(site plan,stilt plan,floor 1 plan) in building layout plan and (2,3,4,5,6,7,8,9 floor plan+terrace plan) in architectural drawings and (front elevation,section,right left elevation,back elevation) in structural drawing due to space constraint.The finish date committed for the project as per Form"B" is 03/12/2021,which is beyond the validity period of the approved maps.The promoter takes the responsibility to obtain the necessary extension from the competent authority. 2. The project status has been changed on 27 Jan, 2021 from "New Project" to "On-going Project" as per the email received from RERA on 27 Jan, 2021.

Other

42286.59 (Sq. Meters) Total Area
4992.15 (Sq. Meters) Phase Area
2525.15 (Sq. Meters) Open Area
32649.69 (Sq. Meters) Total Builtup Area
340 Sanctioned Units / Plots / Apartments

Promoter Details

Location Map