08527 644675 Request a Call Back

INDRAPRASTH (PHASE 3)

Posted: 1 month ago
9

Overview

Accommodation
Group Housing
Khasra Number
76, 209/2, 215/1, 215/2, 237/1 and 216/1
RERA Number
RAJ/P/2017/355
Application Number
RAJ-RERA-APP-P-2017-833

About INDRAPRASTH (PHASE 3)

1. M/s Amar Adeshwar Infrastructure is proposing to develop an Affordable Housing Project (EWS/LIG) namely Indraprasth under the Mukhya Mantri Jan Awaas Yojna 2015. This is a new project and is proposed to be developed in Jodhpur. As per the guidelines of CMJAY 2015 in UDH notification dated 3rd April 2017, the timeline of completion of EWS/LIG component of the projects proposed under the provisions Clause 4A in General Conditions are within time limits stipulated in the above said notification OR time taken by any Government Agency in issuing required certificate/approval will be deducted from the total construction period. Promoter reserves the right to develop more flats based on the incentive FAR available and extension / sanction and approvals for higher floors or more number of units, whichever is applicable and as per guidelines / rules in this regard on this land. This project is approved by empanelled architect under provision 3A of CMJAY 2015. As per UDH circular dated: 28th June 2016 and 4th Oct 2017, and the application was done in JDA (Jodhpur), and the process of 90A is not essential, as the land use in Master Plan is for residential purposes. The total plot area of land is 44,515.35 sq. mtrs, out of which we have proposed the plot of 27,310.14 sq. mtrs for CMJAY 2015 and for their required set back area. We have also shown the adjoining open area land admeasuring 17,648.70 sq. mtrs. In future, if there is a good response to the scheme, then we shall be able to use the same land for expansion of the project and/or otherwise we shall utilize the balance land for other purposes. Hence, just for the sake of transparency, we have bifurcated the plot uses and open vacant land. All the sanction drawings are uploaded in approved plans. If any uploaded PDF file compressed contents are not readable, hard copies of the same are submitted, hence please refer the hard copies. Common facilities drawings shall be uploaded in quarterly updation. 2. The project status has been changed on 27 Jan, 2021 from "New Project" to "On-going Project" as per the email received from RERA on 27 Jan, 2021.

Other

27310.14 (Sq. Meters) Total Area
9103.38 (Sq. Meters) Phase Area
31805.21 (Sq. Meters) Total Builtup Area
324 Sanctioned Units / Plots / Apartments

Promoter Details

Location Map